The Oil and Gas/hydrocarbon processing companies are in high demand for reliable, cost-efficient operations at every production phase. On the energy industry, the organizations share a common challenge. That is to identify who our customers are and what they need in order to execute successfully.
Teebaz Global Resources offers the reliable support our customers in providing their necessary requirements to meet their needs. Our products and services spans from downstream, midstream to upstream, onshore, new or refurbish equipment to support any applications in the oil and gas industry. We have team up with certified experts of experience engineering groups of various disciplines. We have firsthand relationship with original equipment manufacturers to provide our client with a quality and original line of products.
Provision of experience certified engineers and technicians for the installation, operation and maintenance, testing, commissioning, and trouble shooting for:
Job Title: Waukesha 7420 GSI and 8K Compressor Inspection Location: Agbada 1 Flowstation Job Status: September, 2018 – 3rd November, 2018
Job Title: Yokri HR220 Gas Compressor Equipment Overhaul Location: Yokri Additional Details: Waukesha L7042 GSI Engine Driver 40k-Hour Job Status: Ongoing
Job Title: Fire & Gas/H2S System Maintenance for OES Location: Opuama Flow station Start Date: 11/5/2018 End Date: ongoing
Job Title: Maintenance and Servicing of Agbara Booster Pump Engine Type: Booster Pump Location: AGIP ENERGY Start Date: 9/4/2018 End Date: ongoing
Job Title: Maintenance and Servicing of Agbara Booster Pump Engine Type: Booster Pump Location: AGIP ENERGY Start Date: 27/1/2018 End Date: 9/2/2018
Job Title: Nuovon Pignone Gas Compressor Overhaul Engine Type: GE4HG Location: Okoloma, SPDC
Teebaz Global Team hoist a Generator set from Belema platform to a work barge.
Job Title: Installation and Commissioning of CPU-95 Shielded Ignition System Engine Type: CATERPILLER G3408 Location: NORTH BANK Start Date: 23/2/2017 End Date: 27/2/2017
Job Title: Installation and Commissioning of CPU-95 Shielded Ignition System Engine Type: CATERPILLER G3408 Location: SOUTH BANK
Job Title: Installation and Commissioning of CPU-95 Shielded Ignition System Engine Type: CATERPILLER G342 Location: ESCRAVOS
Job Title: Installation and Commissioning of CPU-95 Shielded Ignition System Engine Type: CATERPILLER G3412 Location: OPUKUCHI Start Date: 5/1/2017 End Date: 12/1/2017
Job Title: Installation and Commissioning of CPU-95 Shielded Ignition System Engine Type: CATERPILLER G3412 Location: OTUMARA Start Date: 2/2/2017 End Date: 5/2/2017
Job Title: Inspection of pumps Engine Type: NUOVO PIGNONE Location: AGIP ENERGY
Job Title: Inspection of SOKU Booster Compressor Location: SOKU
Job Title: Preservative maintenance of Waukesha Gas Engine Engine Type: WAUKESHA Location: IMO RIVER
Job Title: Preservative maintenance of Waukesha Gas Engine Engine Type: WAUKESHA Location: BONNY
Job Title: Revamp and commissioning Engine Type: WAUKESHA 5790 GSIU, NUOVO PIGNONE 4HM Location: ESCRAVOS Start Date: 10/2/2017 End Date: 4/3/2017
Job Title: Commissioning Booster Compressor Engine Type: WAUKESHA Location: BELEMA Start Date: 27-2-2017 End Date: 8/3/2017
Job Title: Inspection and Preservative Maintenance of Gas generator Engine Type: WAUKESHA P48 Location: BELEMA Start Date: 13-2-2017 End Date: 15-2-2017
Job Title: 40K Inspection and Overhaul Engine Type: WAUKESHA L7042 Location: YOKRI Start Date: 4/1/2017 End Date:
Installation of CPU 95 Shielded Ignition Location: Escravos Date: 21 August, 2016
Installation of CPU 95 shielded Ignition System Location: Shell IA Date: 20th April, 2016 Engine type: 3408
Installation of shielded ignition system at SPDC North bank flow station. 14/12/2015
Installation of shielded ignition system at SPDC South bank flow station. 12/12/2015
We are glad to inform you that Teebaz Global Resources Limited has moved to a bigger, better and more convenient location. The new address is NO. 30 CLOSE A, FHA, OFF PETER ODILI ROAD, TRANS AMADI, PORT HARCOURT.
Provision of Waukesha Gas Engines Healthcare for SPDC facilities
On-Site Yokri Compressor Unit-2 Waukesha Engine Overhaul Service Contract for SPDC West Asset.
Maintenance Support for Shielded Ignition Systems for SPDC East Asset (SWAMP) Start Dating: 01/08/14 End Date: 31-07-2015
Maintenance Support for Shielded Ignition Systems for SPDC East Asset (LAND) 01/08/14 to 31-07-2014
Provision of on-site preservative maintenance for Golden Light Engineering and by extension Moni-Pulo. Agbani FPF installed gas compressor. Duration:01-07-2104 to 30-06-2015
Assessment / Evaluation of the Technical and Economic Viability of the Installed Agbani Gas Compression, Lift and Re-Injection Package for Golden Light Engineering and by extension Moni-Pulo. 01-07-2014